Home › Planning permission for air conditioning

Do you need planning permission for air conditioning?

For most houses in England, no, as long as the system heats as well as cools and the outdoor unit goes in the right place. Flats, conservation areas, listed buildings and commercial premises are different. This page sets out the national rules as they stand, in plain English.

This is a summary for England, not legal advice. Your council has the final say for your address.

The short answer

House, heats and cools
Usually permitted
Cooling-only unit
Needs permission
Terrace or semi
First outdoor unit only
Detached house
First two outdoor units
Listed building
Consent needed
Flat
Freeholder consent

Why heating matters

Modern split air conditioners are air-to-air heat pumps: the same unit cools in summer and heats in winter. Since the rules changed in 2025, an air-to-air heat pump can be installed on a house in England as permitted development, which means no planning application, provided it meets every national condition. A unit used only for cooling doesn’t qualify.

Every system we fit heats as well as cools, so for most houses the question is really about where the outdoor unit goes.

The conditions for a house or block of flats

  • Noise standard. The installation must comply with the MCS 020(a) planning standard, which limits noise at the neighbour’s nearest window. From 28 May 2026, MCS 020(a) is the only accepted standard.
  • Size. The outdoor unit, including any housing, can’t be more than 1.5 cubic metres on a house, or 0.6 cubic metres on a block of flats.
  • How many. Only the first outdoor unit is permitted development on a house that isn’t detached, or on a block of flats. A detached house can have two.
  • No wind turbine. If there is already a wind turbine on the property, an air source heat pump needs permission.
  • Not on a pitched roof. On a flat roof, every part of the unit must be at least a metre from the edge.
  • Not facing the road above the ground floor. Outside conservation areas, the unit can’t go on any part of a wall above ground-floor level if that wall faces a road.
  • Conservation areas and World Heritage Sites. The unit can’t go on a wall or roof that faces a road, or be closer to a road than the house itself.
  • Listed buildings and scheduled monuments. Permitted development doesn’t apply. You need consent.

The unit must also not be used solely for cooling, must be removed when no longer needed, and should be sited, as far as practicable, to minimise its effect on the building’s appearance and on the area. Permitted development rights can be removed by a planning condition, an Article 4 direction or another restriction.

Source: Planning Portal, Planning Permission: Air source heat pump.

What this means in practice

Two air conditioning outdoor units at the back of a brick houseTerraces and semis

One outdoor unit

Only the first outdoor unit is covered. If you want several rooms done, a multi-split runs them all from one outdoor unit, usually at the back of the house.

Air conditioning outdoor unit on wall bracketsFlats

Freeholder first

Planning aside, your lease almost always needs the freeholder’s or managing agent’s written consent. See our flats page for how that usually works.

Concealed air conditioning linear diffuser in a modern ceilingListed and conservation

Out of sight

Plan for the outdoor unit at the back or on a flat roof behind a parapet, with pipework inside where possible. Listed buildings need consent before any work.

Commercial premises

These permitted development rights are for houses and blocks of flats. Shops, offices and restaurants don’t have them, so new outdoor units on a commercial building often need planning permission, as well as the landlord’s consent. See our commercial air conditioning page.

Planning questions

Can my neighbour object to my air conditioning unit?

If the installation is permitted development there is no application for them to object to. The noise standard exists to protect neighbours, so placing the outdoor unit away from their windows matters.

Does an Article 4 direction stop me having air conditioning?

No, but it can mean you need to apply for planning permission for work that would otherwise be permitted. Directions often cover only certain streets or certain kinds of work, so check the details with your council.

Do I need Building Regulations approval?

The electrical work has to meet the wiring regulations, and refrigerant work must be done by an F-Gas registered company. Airconcool’s F-Gas company registration is FGAS3011677.

I want two outdoor units on my semi. What are my options?

Either apply for planning permission for the second unit, or use a multi-split so several rooms share one outdoor unit.